What we put to the test
Interface & Protocol Requirements
Testing of applicable interface and network protocol requirements specified in the relevant TEC standards.
Interoperability
Testing with reference implementations and peer equipment in a controlled test environment.
IPv6 Requirements
Verification of applicable IPv6 requirements specified in the relevant TEC standards for each equipment category.
Functional & Performance Testing
Testing of applicable functional features and performance parameters specified in the relevant TEC standards.
Built for your team.
Delivered as evidence.
- Equipment manufacturers and OEMs selling, importing or deploying their products in India
- Importers, brand owners and their Indian representatives
- Operators and enterprises qualifying equipment for their networks
- A test plan mapped to the applicable Essential Requirement
- Clause-by-clause test reports with supporting evidence and logs
- Clear findings, with engineering support to fix identified issues before certification
On our test benches
The standards behind the work
Where this leads next
Telecom
Telecom equipment, IPv6 and security certification for India and beyond.
Telecom compliance↗ComSec / ITSAR
Security evaluation of telecom equipment as per NCCS’s Indian Telecom Security Assurance Requirements.
Independent testing↗Gap Analysis & Pre-Compliance
Find and close gaps before formal testing or certification.
